Summary
Construct the pump station, tank, and site improvements at the new ROCKY BOY'S ON-RESERVATION PHASE 1 site. The Contract No. 1: Phase 1 Pump Station and Tank consists of the following improvements: New construction of a 5.4 MGD pump station., New architectural precast building, below grade cast in place concrete, structural steel, roofing, windows and doors, Associated process equipment, pumps, piping, valves, chemical feed, and appurtenances, Mechanical system including HVAC units, duct work, fans, Electrical work generally consists of new switch gear, motor control centers, emergency backup power generator, conduits, cables, and other connections, The installation of site pipe ranging from 3/4 to 24 pipe with appurtenances, valves, etc. Installation of cathodic protection systems, Final site grading, street signage, and access road completion, Landscaping, fencing, drainage systems, and seeding, Exterior site lighting. New construction of 1 MG AWWA D110 Type III prestressed concrete tank or AWWA D103 glass-fused boltedsteel tank (Alternate No. 1).