Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Chelan Douglas Regional Port Authority
Work associated with proposed improvements is generally described as follows: Installation of a 4,000-gallon double walled above-ground fuel storage System containing 3,000 gallons of diesel fuel and 1,000 gallons of unleaded gasoline. Concrete tank footings, tank pad, fueling pad will be installed. Work includes design of fuel tank footing, excavation, pavement demolition, asphalt paving, lighting and drainage improvements.
Posted Date
May 18, 2026
Due Date
Jun 10, 2026
Release: May 18, 2026
Chelan Douglas Regional Port Authority
Close: Jun 10, 2026
Work associated with proposed improvements is generally described as follows: Installation of a 4,000-gallon double walled above-ground fuel storage System containing 3,000 gallons of diesel fuel and 1,000 gallons of unleaded gasoline. Concrete tank footings, tank pad, fueling pad will be installed. Work includes design of fuel tank footing, excavation, pavement demolition, asphalt paving, lighting and drainage improvements.
AvailableChelan Douglas Regional Port Authority
Construction of approx 7,449 CY of Roadway Excavation Incl. Haul; 3,577 LF of 18" PVC C900 Pipe for Water Main; 6 LF of 6 " DI Restrained Joint Pipe for Water Main; 76 LF of 6" PVC Restrained Joint C900 Pipe for Water Main; 73 LF of 8" PVC Restrained Joint C900 Pipe for Water Main; 107 LF of 12" PVC Restrained Joint C900 Pipe for Water Main; 4,755 LF of 18" PVC Restrained Joint C900 Pipe for Water Main; Pipe Cleaning by Pig; Shoring.
Posted Date
Apr 29, 2026
Due Date
May 20, 2026
Release: Apr 29, 2026
Chelan Douglas Regional Port Authority
Close: May 20, 2026
Construction of approx 7,449 CY of Roadway Excavation Incl. Haul; 3,577 LF of 18" PVC C900 Pipe for Water Main; 6 LF of 6 " DI Restrained Joint Pipe for Water Main; 76 LF of 6" PVC Restrained Joint C900 Pipe for Water Main; 73 LF of 8" PVC Restrained Joint C900 Pipe for Water Main; 107 LF of 12" PVC Restrained Joint C900 Pipe for Water Main; 4,755 LF of 18" PVC Restrained Joint C900 Pipe for Water Main; Pipe Cleaning by Pig; Shoring.
Chelan Douglas Regional Port Authority
Works include approx. 13,900 CY roadway excavation incl. haul; 2,570 TN crushed surfacing base course; 1,010 LF of 12" PVC C900 pipe for water main; 1,938 LF of 18" PVC C900 pipe for water main.
Posted Date
Apr 22, 2026
Due Date
May 19, 2026
Release: Apr 22, 2026
Chelan Douglas Regional Port Authority
Close: May 19, 2026
Works include approx. 13,900 CY roadway excavation incl. haul; 2,570 TN crushed surfacing base course; 1,010 LF of 12" PVC C900 pipe for water main; 1,938 LF of 18" PVC C900 pipe for water main.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Chelan Douglas Regional Port Authority
The board discussed key actions including the easement purchase and sale agreement with Three Lakes Public Golf Club for water utility infrastructure, and an interlocal agreement with the Foster Creek Conservation District for vegetation management and a storage shed at the Mansfield Airport. Additionally, the agenda indicates presentations on brewing and urban development, as well as several informational updates regarding park dock plans, economic development planning, sewer projects, and grant updates.
The meeting agenda includes presentations from Timberline Brewing and a Cashmere work session. Action items for the Port Authority involve an easement purchase and sale agreement with Three Lakes Public Golf Club and an interlocal agreement with the Foster Creek Conservation District for the Mansfield Airport. Additional agenda items cover the Orondo River Park grant agreement amendment, an update on the Orondo River Park dock plan, a review of the economic development plan, planning for the Malaga Sewer, and various staff reports.
The board meeting agenda includes a presentation from Our Valley Our Future, several action items such as awarding contracts for tenant improvements and professional consulting services, and requests for authorization to seek bids for water main projects. Additionally, the agenda covers a grant request for a non-profit organization, a lease amendment for the Confluence Technology Center, and various informational reports on airport activity, architecture selection, and marketing plans, as well as miscellaneous staff reports.
This document provides updated market intelligence for Pangborn Memorial Airport, focusing on the Wenatchee market. It analyzes passenger retention and leakage, the evolving aviation industry landscape including macro-economic factors and fleet changes. The report identifies key air service goals for the airport, which include establishing nonstop service to Portland and exploring low-cost carrier partnerships for destinations such as Phoenix, Las Vegas, Los Angeles Basin, and the Bay Area.
The agenda for the Chelan Douglas Regional Port Authority meeting included several presentations on the Confluence Technology Center Clean Buildings Compliance and an Organizational Assessment by Baker Tilly. Action items included seeking authorization to apply for a Clean Buildings Performance Grant from the WA Department of Commerce, addressing a CCR Variance Request for the Wenatchee Valley Technical Skills Center, and authorizing the award for Terminal Secure Area Plumbing Improvements. Informational items covered 2025 Actual Carryforward Balances, WSDOT Grant Applications, CTC Office Space Occupancy Requirements, and a RESTORE Coalition Request. Miscellaneous staff reports provided updates across various departmental functions. The agenda also allowed for an Executive Session to discuss litigation or legal risks.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Chelan Douglas Regional Port Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge