Terminal Chiller Replacement RFP
Aug 27, 2026
Closes
Sep 24, 2026
Project consists of replacement of existing water-cooled centrifugal chiller with new air cooled chiller; replacement of chilled water circulating pumps; replacement of air separator, expansion tank and other hydronic accessories; demolition of existing cooling tower and condenser water circulating pumps; hydronic piping modifications; electrical system modifications to support installation of new chiller equipment and pumps.
