Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Chalfont-New Britain Township Joint Sewage Authority
Chalfont-New Britain Township Joint Sewage Authority is soliciting bids for construction phase 2 improvements to its wastewater treatment plant, including removal and replacement of aeration, pumps, valves, piping, and related electrical and controls equipment. The project is split into two separate bid contracts for general and electrical construction and includes a non-mandatory pre-bid conference on March 10, 2026. Bids must be submitted electronically via the PennBID portal by the deadline on March 31, 2026.
Posted Date
Feb 26, 2026
Due Date
Mar 31, 2026
Release: Feb 26, 2026
Chalfont-New Britain Township Joint Sewage Authority
Close: Mar 31, 2026
Chalfont-New Britain Township Joint Sewage Authority is soliciting bids for construction phase 2 improvements to its wastewater treatment plant, including removal and replacement of aeration, pumps, valves, piping, and related electrical and controls equipment. The project is split into two separate bid contracts for general and electrical construction and includes a non-mandatory pre-bid conference on March 10, 2026. Bids must be submitted electronically via the PennBID portal by the deadline on March 31, 2026.
AvailableChalfont-New Britain Township Joint Sewage Authority
Project includes removal of existing process direct digital control (PDDC) programmable logic controller (PLC) and installation of a new PDDC PLC for a UV disinfection system, installation and programming of a UV transmittance analyzer, and related startup; installation and programming of an orthophosphate analyzer and peristaltic metering pump for ferric chloride; removal of internal mechanisms of eight (8) rectangular final settling tanks and installation of new internal mechanisms, installation of new fiberglass baffles, replacement of t-valves, and addition of knife gate valves to the scum withdrawal pipes.
Posted Date
Jun 30, 2025
Due Date
Jul 31, 2025
Release: Jun 30, 2025
Chalfont-New Britain Township Joint Sewage Authority
Close: Jul 31, 2025
Project includes removal of existing process direct digital control (PDDC) programmable logic controller (PLC) and installation of a new PDDC PLC for a UV disinfection system, installation and programming of a UV transmittance analyzer, and related startup; installation and programming of an orthophosphate analyzer and peristaltic metering pump for ferric chloride; removal of internal mechanisms of eight (8) rectangular final settling tanks and installation of new internal mechanisms, installation of new fiberglass baffles, replacement of t-valves, and addition of knife gate valves to the scum withdrawal pipes.
Chalfont-New Britain Township Joint Sewage Authority
Project includes removal of existing process direct digital control (PDDC) programmable logic controller (PLC) and installation of a new PDDC PLC for a UV disinfection system, installation and programming of a UV transmittance analyzer, and related startup; installation and programming of an orthophosphate analyzer and peristaltic metering pump for ferric chloride; removal of internal mechanisms of eight (8) rectangular final settling tanks and installation of new internal mechanisms, installation of new fiberglass baffles, replacement of t-valves, and addition of knife gate valves to the scum withdrawal pipes.
Posted Date
Jun 30, 2025
Due Date
Jul 31, 2025
Release: Jun 30, 2025
Chalfont-New Britain Township Joint Sewage Authority
Close: Jul 31, 2025
Project includes removal of existing process direct digital control (PDDC) programmable logic controller (PLC) and installation of a new PDDC PLC for a UV disinfection system, installation and programming of a UV transmittance analyzer, and related startup; installation and programming of an orthophosphate analyzer and peristaltic metering pump for ferric chloride; removal of internal mechanisms of eight (8) rectangular final settling tanks and installation of new internal mechanisms, installation of new fiberglass baffles, replacement of t-valves, and addition of knife gate valves to the scum withdrawal pipes.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Chalfont-New Britain Township Joint Sewage Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Chalfont-New Britain Township Joint Sewage Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database