Sources Sought: Neopit Dam Remediation Construction
Posted
Oct 23, 2026
Nov 2, 2026
Neopit dam remediation construction. Spillway, outlet works, stilling basin, and hydropower bays as the principal hydraulic structures. These structures are expected to be reinforced concrete construction. Extending from each end of the spillway and ancillary structural features will be two (2) separate embankments to tie-in these structures with the existing ground at the left and right abutments.



