Detention Pond 3D-4 for Cedar Port Navigation and Improvement District RFP
Posted
-
Dec 3, 2026
Scope of Work for this Contract includes the clearing, grading, and construction of a detention pond approx. 21 acres (surface area) with associated backslope interceptor and outfall structures. An underground storm sewer system approx. 6,620 LF of storm sewer of various sizes (24–60-inch pipes) including inlets, junction boxes, and Headwalls. And a landscape berm (1,200 LF, 20 ft. top width, 80 ft. Bottom width, and approx. 8 ft in height).