Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Cedar Bayou Park Utility District
Work includes clearing approx 2 AC for the construction of a 16" water main (approx. 3,330 LF) and a 12" fire line (approx. 5,360 LF) including appurtenances and fittings.
Posted Date
May 19, 2026
Due Date
Jun 4, 2026
Release: May 19, 2026
Cedar Bayou Park Utility District
Close: Jun 4, 2026
Work includes clearing approx 2 AC for the construction of a 16" water main (approx. 3,330 LF) and a 12" fire line (approx. 5,360 LF) including appurtenances and fittings.
AvailableCedar Bayou Park Utility District
Work includes construction of pkwy. Approx. 2,660 LF of concrete roadway, 82' wide, consisting of 4-lanes and a center turn lane and a right-of-way width of 300'. The project will also include roadside channels (approx. 60' top width and 6' concrete bottom width) on both sides of the road including culvert outfalls to adjacent ponds with associated drainage structures (concrete sloped paving, and headwalls).
Posted Date
May 19, 2026
Due Date
Jun 4, 2026
Release: May 19, 2026
Cedar Bayou Park Utility District
Close: Jun 4, 2026
Work includes construction of pkwy. Approx. 2,660 LF of concrete roadway, 82' wide, consisting of 4-lanes and a center turn lane and a right-of-way width of 300'. The project will also include roadside channels (approx. 60' top width and 6' concrete bottom width) on both sides of the road including culvert outfalls to adjacent ponds with associated drainage structures (concrete sloped paving, and headwalls).
AvailableCedar Bayou Park Utility District
Work includes clearing approx. 2 acres surface area for the construction of a 24 sanitary sewer main (approx. 3,670 LF) including manholes and associated structures.
Posted Date
Apr 7, 2026
Due Date
May 7, 2026
Release: Apr 7, 2026
Cedar Bayou Park Utility District
Close: May 7, 2026
Work includes clearing approx. 2 acres surface area for the construction of a 24 sanitary sewer main (approx. 3,670 LF) including manholes and associated structures.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge