Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Casper/Natrona County International Airport
Base Bid: Project consists of a New Airport Traffic Control Tower (ATCT) & Base Building Facility at CPR. The ATCT Cab is an 8-sided, approximate 440 square foot space with a 360-degree view sitting on top of an approximate 127' tall shaft. The supporting Base Building is approximately 2,700 gross square feet. The work generally includes deep foundations, grade beams, concrete slabs, load bearing cold formed metal framing, masonry, interior finishes, fire protection systems, mechanical systems, electrical systems and Telecommunications systems. Bid Alternate 1 - Fiber Optic Cabling and Duct Bank to Radar Site ASR8.
Posted Date
Jun 2, 2026
Due Date
Jul 14, 2026
Release: Jun 2, 2026
Casper/Natrona County International Airport
Close: Jul 14, 2026
Base Bid: Project consists of a New Airport Traffic Control Tower (ATCT) & Base Building Facility at CPR. The ATCT Cab is an 8-sided, approximate 440 square foot space with a 360-degree view sitting on top of an approximate 127' tall shaft. The supporting Base Building is approximately 2,700 gross square feet. The work generally includes deep foundations, grade beams, concrete slabs, load bearing cold formed metal framing, masonry, interior finishes, fire protection systems, mechanical systems, electrical systems and Telecommunications systems. Bid Alternate 1 - Fiber Optic Cabling and Duct Bank to Radar Site ASR8.
AvailableCasper/Natrona County International Airport
Parking lot improvements - phase 1: ADA access, lighting, security cameras, and fiber optics - phase 2: parking lot entrance/exit island infrastructure. 1 LS Mobilization (10% max); 150 LF Remove Existing Concrete Curb and Gutter; 140 SY Remove Existing Sidewalk; 27 SY Remove Existing Asphalt; 10 LF Remove Existing Fence; 221 SY New 4" Concrete Sidewalk; 57 LF New Concrete Curb and Gutter; 85 LF New Modified Concrete Curb and Gutter; 4 EA New Sidewalk ADA Detectable Warning Mat. See outside link.
Posted Date
Mar 26, 2026
Due Date
Apr 21, 2026
Release: Mar 26, 2026
Casper/Natrona County International Airport
Close: Apr 21, 2026
Parking lot improvements - phase 1: ADA access, lighting, security cameras, and fiber optics - phase 2: parking lot entrance/exit island infrastructure. 1 LS Mobilization (10% max); 150 LF Remove Existing Concrete Curb and Gutter; 140 SY Remove Existing Sidewalk; 27 SY Remove Existing Asphalt; 10 LF Remove Existing Fence; 221 SY New 4" Concrete Sidewalk; 57 LF New Concrete Curb and Gutter; 85 LF New Modified Concrete Curb and Gutter; 4 EA New Sidewalk ADA Detectable Warning Mat. See outside link.
Casper/Natrona County International Airport
Construction of an addition to the existing snow removal equipment (SRW) building completed in 2016. This addition will add approx., 12,000 - 18,000 SF to the building.
Posted Date
Feb 11, 2025
Due Date
Mar 18, 2025
Release: Feb 11, 2025
Casper/Natrona County International Airport
Close: Mar 18, 2025
Construction of an addition to the existing snow removal equipment (SRW) building completed in 2016. This addition will add approx., 12,000 - 18,000 SF to the building.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge