Water Meter Replacement
Aug 16, 2026
Closes
Sep 2, 2026
Work consists of replace 23 residential water service meters with radio read meters; replace 23 meter box lids; optionally replace existing crop stops if missing or nonfunctional. Install one new meter and can with service line.