Hackberry Subdivision Drainage Improvements RFP
Posted
-
Dec 15, 2026
The project consists of the demolition and removal of the existing outfall culverts; the construction of the proposed outfall culverts including end treatments, the installation of a 6 diameter custom pipe storm structure, the installation of concrete erosion mats, and the addition of fill along the exiting north-east berm, to raise the berm.



