Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Broome Developmental Center Mental Retardation & Developmental Disabilities
Install new 12" diameter concrete form tubes for concrete piers set at a minimum depth of 48" every 6'. Place 2 continuous longitudinal runs of #4 rebar per pier. Place 5/8" Stainless Steel threaded anchor 8" deep into top of pier.
Posted Date
May 19, 2026
Due Date
Jun 11, 2026
Release: May 19, 2026
Broome Developmental Center Mental Retardation & Developmental Disabilities
Close: Jun 11, 2026
Install new 12" diameter concrete form tubes for concrete piers set at a minimum depth of 48" every 6'. Place 2 continuous longitudinal runs of #4 rebar per pier. Place 5/8" Stainless Steel threaded anchor 8" deep into top of pier.
AvailableBroome Developmental Center Mental Retardation & Developmental Disabilities
Replace 2 AHU & 2 Condensing Units, line-set & drain piping.
Posted Date
May 18, 2026
Due Date
Jun 11, 2026
Release: May 18, 2026
Broome Developmental Center Mental Retardation & Developmental Disabilities
Close: Jun 11, 2026
Replace 2 AHU & 2 Condensing Units, line-set & drain piping.
AvailableBroome Developmental Center Mental Retardation & Developmental Disabilities
The project consists of the removal of a partition, a set of double egress doors and associated hardware. There will also be removal of aluminum storefront, glazing, and concrete masonry units as indicated on the drawings. New work consists of the construction of a 2-hour fire barrier with 1-1/2-hour rated double egress doors. Doors will be on magnetic hold opens with connection to the fire alarm system. Hardware is specified so that the doors can have a card access added in the future. Areas where the storefront has been removed will be infilled with concrete masonry units to match existing adjacent surfaces. There will be patching to match existing quarry tile flooring and base.
Posted Date
Feb 20, 2026
Due Date
Mar 20, 2026
Release: Feb 20, 2026
Broome Developmental Center Mental Retardation & Developmental Disabilities
Close: Mar 20, 2026
The project consists of the removal of a partition, a set of double egress doors and associated hardware. There will also be removal of aluminum storefront, glazing, and concrete masonry units as indicated on the drawings. New work consists of the construction of a 2-hour fire barrier with 1-1/2-hour rated double egress doors. Doors will be on magnetic hold opens with connection to the fire alarm system. Hardware is specified so that the doors can have a card access added in the future. Areas where the storefront has been removed will be infilled with concrete masonry units to match existing adjacent surfaces. There will be patching to match existing quarry tile flooring and base.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge