Diffused Aeration System Replacement RFP
Posted
Sep 24, 2026
Oct 23, 2026
Work includes replacement of the existing diffused aeration system in the aeration tanks including perform demolition of existing tank pipe drop legs and existing diffused aeration system components in all aeration tanks, replacement of drop legs piping and installation of isolation valves in both aeration tank nos 1 and no 2 to provide diffused aeration grid on either side of baffle wall. See attached file.
