Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
Integrated Postsecondary Education Data System identifier.
University or college mascot.
Full-time equivalent employees.
Graduation rate percentage.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Bridgewater State University
Roof membrane repairs, surface preparation, flashing and detail repairs and the application of a polyurea fluid-applied roof coating system.
Posted Date
Jul 15, 2026
Due Date
Jul 30, 2026
Release: Jul 15, 2026
Bridgewater State University
Close: Jul 30, 2026
Roof membrane repairs, surface preparation, flashing and detail repairs and the application of a polyurea fluid-applied roof coating system.
AvailableBridgewater State University
Install stamped concrete hardscape improvements at a designated campus location. The work is intended to enhance the appearance, functionality, and durability of the site through the construction of a decorative brick-stamped concrete plaza and bench pads. The project includes site preparation, excavation, gravel base installation, reinforcing steel placement, concrete placement, stamping, coloring, sealing, and restoration of all disturbed areas to provide a safe, attractive, and long-lasting finished installation.
Posted Date
Jun 17, 2026
Due Date
Jul 1, 2026
Release: Jun 17, 2026
Bridgewater State University
Close: Jul 1, 2026
Install stamped concrete hardscape improvements at a designated campus location. The work is intended to enhance the appearance, functionality, and durability of the site through the construction of a decorative brick-stamped concrete plaza and bench pads. The project includes site preparation, excavation, gravel base installation, reinforcing steel placement, concrete placement, stamping, coloring, sealing, and restoration of all disturbed areas to provide a safe, attractive, and long-lasting finished installation.
Bridgewater State University
Demolition, build partitions for bookstore subdivision and storage area with partial finishes applies. Limited electrical work for power, data, fire strobe. Existing mechanical and fire protection to remain.
Posted Date
May 29, 2026
Due Date
Jun 12, 2026
Release: May 29, 2026
Bridgewater State University
Close: Jun 12, 2026
Demolition, build partitions for bookstore subdivision and storage area with partial finishes applies. Limited electrical work for power, data, fire strobe. Existing mechanical and fire protection to remain.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Not viable here; redirect to the public competitive bid path.
Coops: Frequently procures through Sourcewell and NASPO ValuePoint; you can gain access through the Starbridge reseller & contract-vehicle platform — reach out to your Starbridge contact to pursue onboarding.
Bridgewater State University (MA) shows no evidence of sole source contracting; expect formal competitive bidding. No specific sole source dollar thresholds were identified in public records.
Track vendor wins and renewal opportunities
Bridgewater State University
This document is Purchase Order P0065899 issued by Bridgewater State University to D2L Ltd for software and support services including Brightspace Core, Creator+, and Plus Administrator Support. The service period is from August 1, 2025, to July 31, 2026, for a total amount of 31,464.00 USD, with Net 30 payment terms.
Effective Date
Aug 1, 2025
Expires
Effective: Aug 1, 2025
Bridgewater State University
Expires:
This document is Purchase Order P0065899 issued by Bridgewater State University to D2L Ltd for software and support services including Brightspace Core, Creator+, and Plus Administrator Support. The service period is from August 1, 2025, to July 31, 2026, for a total amount of 31,464.00 USD, with Net 30 payment terms.
AvailableBridgewater State University
This is a new Commonwealth Standard Contract between Bridgewater State University and CampusCE Corporation for the provision of CampusCE Education Management System (EMS) Suite Version 6.0 services. The contract covers implementation, training, support, and business consulting. It has a maximum obligation of $9,500.00, is effective from July 1, 2024, to June 30, 2025, and incorporates Commonwealth IT Terms and Conditions as well as detailed service plans and exhibits.
Effective Date
Jul 1, 2024
Expires
Effective: Jul 1, 2024
Bridgewater State University
Expires:
This is a new Commonwealth Standard Contract between Bridgewater State University and CampusCE Corporation for the provision of CampusCE Education Management System (EMS) Suite Version 6.0 services. The contract covers implementation, training, support, and business consulting. It has a maximum obligation of $9,500.00, is effective from July 1, 2024, to June 30, 2025, and incorporates Commonwealth IT Terms and Conditions as well as detailed service plans and exhibits.
Bridgewater State University
This contract is an Order Form for D2L Ltd.'s Brightspace Learning Management System (LMS) services, software, and support, along with a detailed Statement of Work, provided to Bridgewater. The agreement spans three years, from August 1, 2024, to July 31, 2027. It includes annual pricing for software, services, and support, with specific line items per year. The contract also incorporates general Order Terms and Conditions and a Statement of Work outlining implementation phases, deliverables, responsibilities, and general assumptions for the LMS installation, configuration, course conversion, system integration, authentication, and various training programs.
Effective Date
Aug 1, 2024
Expires
Effective: Aug 1, 2024
Bridgewater State University
Expires:
This contract is an Order Form for D2L Ltd.'s Brightspace Learning Management System (LMS) services, software, and support, along with a detailed Statement of Work, provided to Bridgewater. The agreement spans three years, from August 1, 2024, to July 31, 2027. It includes annual pricing for software, services, and support, with specific line items per year. The contract also incorporates general Order Terms and Conditions and a Statement of Work outlining implementation phases, deliverables, responsibilities, and general assumptions for the LMS installation, configuration, course conversion, system integration, authentication, and various training programs.
AvailableSee expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Board meetings and strategic plans from Bridgewater State University
The meeting included reports on the university's transition regarding student trustees, commencement planning, and various operational updates including the university's status as a top workplace, funding for a new co-op program, and an assessment of AI competency in the curriculum. The Board reviewed the impact of state budget appropriations on university finances, received a comprehensive presentation on BSU Dining operations and sustainability efforts, and approved the renaming of the SGA Council Chambers to honor Dan Darcy and the awarding of posthumous tenure to Dr. Matthew J. Patey. Additionally, the Board reviewed tenure and promotion recommendations, an update on surplus property, and reports regarding fall 2026 enrollment projections, alumni development metrics, student wellness programming, and initiatives related to transportation and student success.
The Board of Trustees discussed student trustee goals regarding accessibility and resources, and reviewed reports from the President and various university divisions. Key topics included artificial intelligence initiatives on campus, such as the AI summit, AI ambassador programs, and policy development. The Board reviewed financial and academic reports, approved a Letter of Intent for a B.S. degree in Data Science, and examined sabbaticals, budget reports, and capital project updates. Further discussions covered diversity programs, Title IX data, campus safety, alumni relations, and town-gown relations.
The meeting included reports from the Chairperson and President, which covered staff recognition, student trustee changes, and the university's recent international engagement in Cape Verde and the Azores. A detailed presentation on the development of health professions programs was delivered, emphasizing the university's strategic goals for interdisciplinary and innovative academic offerings. The board approved honorary degree recipients, distinguished service awardees, and the renaming of the Wellness Center art gallery wall. Additional business included updates on divisional strategic priorities, contract delegations for facility and infrastructure projects, student life activities including residence hall occupancy trends, and academic innovation. Furthermore, the board reviewed the FY2026/Q2 trust funds, budget, and contract reports, alongside a progress update regarding the Racial Justice Task Force's recommendations.
The committee meeting agenda included a session focused on advancing racial and other forms of equity through the implementation of strategic and measurable institutional equity-minded indicators.
The board meeting agenda covers several key administrative and financial topics including the approval of the FY2027 board budget, release of executive session minutes, and a review of the Strategic Plan 2.0 update. Financial items include the FY2026/Q3 budget and trust fund reports, contract reports, the continuation budget for FY2027, and the student tuition and fee schedule for the 2026-27 academic year. Additional discussion items include a capital projects update, alumni and foundation reports, crisis management protocols, institutional equity-minded indicators, and the selection of the slate of board officers for the 2026-27 academic year.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Bridgewater State University's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Academic Director of Global Services, Minnock Institute for Global Engagement
Premium
Access the largest public sector contact database
© 2026 Starbridge