Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Bridgestone Mud
The project consists of extending the public 8-inch (8") waterline approx. 770 LF primarily designated as trenchless construction within district easements.
Posted Date
Jun 19, 2026
Due Date
Jul 6, 2026
Release: Jun 19, 2026
Bridgestone Mud
Close: Jul 6, 2026
The project consists of extending the public 8-inch (8") waterline approx. 770 LF primarily designated as trenchless construction within district easements.
AvailableBridgestone Mud
The work consists of the construction of the wastewater treatment plant improvements work including: lift station improvements; aeration basin improvements; aerobic digester improvements; site paving and drainage improvements; electrical; demolition.
Posted Date
Aug 22, 2025
Due Date
Sep 10, 2025
Release: Aug 22, 2025
Bridgestone Mud
Close: Sep 10, 2025
The work consists of the construction of the wastewater treatment plant improvements work including: lift station improvements; aeration basin improvements; aerobic digester improvements; site paving and drainage improvements; electrical; demolition.
Bridgestone Mud
Cleaning and televising approx. 30,903 LF of sanitary sewer pipe including 17,539 LF of 8", 3,812 LF of 10", 3,354 LF of 12", 3,778 LF of 15", and 2,420 LF of 18". The work also includes television inspection of 171 sanitary sewer manholes includes 17,539 LF Sanitary Sewer Cleaning and Televising, 8" diameter, all depths, including sewer flow control (including by-pass pumping), as required; removal of roots, debris, grease, and other obstructions; disposal of sludge & solid materials; removal and replacement of fencing as necessary; traffic control, as needed; placement of door hangers for customers affected by the work; and site restoration, complete as specified, 100 LF heavy cleaning 10" diameter all depths to remove heavy roots, mineral deposits, and other stabilized debris and obstructions from piping by remote control cutting device to include mobilization and demobilization, complete in place, only if and as directed by the Engineer, 171 EA Sanitary Sewer Manhole Television Inspection, all depths and sizes, per specifications including locating manholes, performing H2S testing, cleaning and removal of sludge and solid materials; removal and replacement of fencing as necessary, complete as specified; traffic control, as needed; and site restoration, complete as specified.
Posted Date
Aug 1, 2025
Due Date
Aug 12, 2025
Release: Aug 1, 2025
Bridgestone Mud
Close: Aug 12, 2025
Cleaning and televising approx. 30,903 LF of sanitary sewer pipe including 17,539 LF of 8", 3,812 LF of 10", 3,354 LF of 12", 3,778 LF of 15", and 2,420 LF of 18". The work also includes television inspection of 171 sanitary sewer manholes includes 17,539 LF Sanitary Sewer Cleaning and Televising, 8" diameter, all depths, including sewer flow control (including by-pass pumping), as required; removal of roots, debris, grease, and other obstructions; disposal of sludge & solid materials; removal and replacement of fencing as necessary; traffic control, as needed; placement of door hangers for customers affected by the work; and site restoration, complete as specified, 100 LF heavy cleaning 10" diameter all depths to remove heavy roots, mineral deposits, and other stabilized debris and obstructions from piping by remote control cutting device to include mobilization and demobilization, complete in place, only if and as directed by the Engineer, 171 EA Sanitary Sewer Manhole Television Inspection, all depths and sizes, per specifications including locating manholes, performing H2S testing, cleaning and removal of sludge and solid materials; removal and replacement of fencing as necessary, complete as specified; traffic control, as needed; and site restoration, complete as specified.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Bridgestone Mud
The meeting agenda includes a security report from the Harris County Precinct 4 Constable, the review of various consultant reports such as the Strategic Partnership Agreement Audit and financial bookkeeping reports, and the acceptance or conveyance of infrastructure easements and dedications. Key business items involve maintenance and repair authorizations for detention facilities, administrative actions for delinquent tax collections, garbage and recycling services, and communications website updates. The Board will also review operations, including service terminations and facility maintenance, and hear reports from the Park Manager and the Bridgestone Conservancy. Engineering updates feature multiple sanitary sewer and water plant projects, feasibility studies, and site development plans. Additionally, the Board will consider a grant application for the Texas Water Development Board, the annexation of the Houston 2920, LLC tract, and a general attorney's report.
The Board of Directors held a special session to discuss the proposed contract renewal with Harris County Precinct 4 for law enforcement services. The discussion focused on an 8.8% rate increase for the upcoming fiscal year, the potential for future cost escalations, and an analysis of various participation options regarding the number of deputies and office space expenses. The Board reviewed comparative data on these options and requested further suggestions for consideration at the next meeting.
The Board of Directors will address several routine and operational items, including receiving a security report from the Harris County Precinct 4 Constable. Financial and consultant reports will be reviewed, including the bookkeeper's report, tax assessor/collector's report, and engineering updates on ongoing construction and proposed projects. The board will also consider the qualification of directors, administration of oaths of office, election of officers, and various service agreements, including water and wastewater system amendments and law enforcement contracts. Additionally, the agenda covers the annexation of a specific tract of land, updates on community development projects, and potential deliberation in an executive session regarding real estate negotiations.
The meeting agenda includes a public comment session and a State of the District presentation. The presentation covers general information regarding municipal utility districts, District history, the construction, operation, and maintenance of District facilities, and District finances, including taxes, water and sewer rates, and debt. Additionally, the presentation will address District public engagement.
The board and the canvassing authority are convening to conduct an official election review. The primary agenda items include establishing a quorum, reviewing and correcting election returns and tally lists, formally ordering the canvassing of those returns, declaring the official results of the Directors Election, and issuing the corresponding certificates of election.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Bridgestone Mud's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge