Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Borough of Midland
Work includes approx. 2,000 SY of milling and profiling, superpave wma binder and wearing course, base repair, ada ramps, replacement of inlet, and all necessary appurtenances and restoration for said construction. There are add alternates for an additional 2,100 SY of roadway milling and resurfacing.
Posted Date
Feb 18, 2026
Due Date
Mar 9, 2026
Release: Feb 18, 2026
Borough of Midland
Close: Mar 9, 2026
Work includes approx. 2,000 SY of milling and profiling, superpave wma binder and wearing course, base repair, ada ramps, replacement of inlet, and all necessary appurtenances and restoration for said construction. There are add alternates for an additional 2,100 SY of roadway milling and resurfacing.
AvailableBorough of Midland
Work includes approx 100 LF of in-trench replacement of existing 8" and 10" sanitary sewer, 6 new manhole installations, 4 spot liners, and 975 LF of 10" and 12" complete manhole-to-manhole in-place cipp lining; brick and bituminous trench roadway restoration, sewer line cleaning and television inspection, service lateral reinstatement, and all appurtenances and restoration for said construction in the borough.
Posted Date
Feb 5, 2026
Due Date
Mar 5, 2026
Release: Feb 5, 2026
Borough of Midland
Close: Mar 5, 2026
Work includes approx 100 LF of in-trench replacement of existing 8" and 10" sanitary sewer, 6 new manhole installations, 4 spot liners, and 975 LF of 10" and 12" complete manhole-to-manhole in-place cipp lining; brick and bituminous trench roadway restoration, sewer line cleaning and television inspection, service lateral reinstatement, and all appurtenances and restoration for said construction in the borough.
AvailableBorough of Midland
The Project includes: Headworks project (which includes grinder, screen, auger, bagger, influent flow meter and primary clarifier influent gate replacement), re-wire wastewater treatment plant, perform spot repairs on wastewater treatment plant structures, clarifier drive replacements and replacement of liner and media in the oxidation tower. The plant re-wire will include the following scope of work: 1. Replacement of Operations Building Motor Control Center (MCC) 2. Replacement of Secondary Treatment Pump Station MCC 3. Installation of new Secondary Treatment Pump Station Variable Frequency Drives (VFDs) 4. Installation of a new Secondary Pump Station Programmable Logic Controller (PLC) 5. Replacement of Oxidation Tower Recycle Control Valve 6. Replacement of Digester Building MCC Separate Bids will be received for the following Contracts: Contract 2024-1: General Construction; Contract 2024-2: Electrical construction.
Posted Date
Jul 27, 2025
Due Date
Aug 26, 2025
Release: Jul 27, 2025
Borough of Midland
Close: Aug 26, 2025
The Project includes: Headworks project (which includes grinder, screen, auger, bagger, influent flow meter and primary clarifier influent gate replacement), re-wire wastewater treatment plant, perform spot repairs on wastewater treatment plant structures, clarifier drive replacements and replacement of liner and media in the oxidation tower. The plant re-wire will include the following scope of work: 1. Replacement of Operations Building Motor Control Center (MCC) 2. Replacement of Secondary Treatment Pump Station MCC 3. Installation of new Secondary Treatment Pump Station Variable Frequency Drives (VFDs) 4. Installation of a new Secondary Pump Station Programmable Logic Controller (PLC) 5. Replacement of Oxidation Tower Recycle Control Valve 6. Replacement of Digester Building MCC Separate Bids will be received for the following Contracts: Contract 2024-1: General Construction; Contract 2024-2: Electrical construction.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $23,800, use sole source.
Coops: Lead with coops: Ask the Borough Manager to purchase via Sourcewell or COSTARS to avoid formal bidding.
Borough of Midland (PA): No evidence of a sole source pathway in public records. Pennsylvania’s formal bidding threshold is $23,800; absent a documented exemption, treat sole source as low-probability.
Track Borough of Midland's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Borough of Midland's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database