Betty and Wanda Amphitheater RFP
Aug 20, 2026
Closes
Sep 10, 2026
Bridge underpass electrical renovations. Work includes 170 LF of 2" Rigid Conduit; 170 LF of 3/4" Rigid Conduit; 60 LF of 1/2" Rigid Conduit; 15 EA Lockable Weatherproof Receptacle Box; 18 EA Metal Junction Box; 6 EA Single Phase Multi Amp Receptacles; 9 EA Single Phase Receptacles; 4 EA Security Lights; 4,680 SF of Exterior Wall Painting.
