2025 Elizabeth Sidewalk Project RFP
Posted
Oct 23, 2026
Nov 10, 2026
The work essentially includes removal of existing concrete sidewalk and install new sidewalk. Work includes 3,225 SF of remove concrete sidewalk; 2,590 SF of remove grass strip; 4 Ea remove trees/stumps; 4,900 SF of 7' wide concrete sidewalk; 113 LF of concrete landscape curbing; 3 EA ADA accessible ramp; 317 SF of grass restoration; stop signs and ADA sign.


