Water Plant No. 2 Improvements for Blue Ridge West MUD
Posted
Sep 13, 2026
Oct 1, 2026
Work includes demolition of one (1) 125,000-gallon welded steel ground storage tank; one (1) 20,000-gallon hydropneumatic tank including foundation; two (2) 750-gpm booster pumps including foundation. Construction of one (1) 200,000-gallon welded steel gst, with self-supporting umbrella roof, including foundation; one (1) 20,000-gallon hydropneumatic tank including foundation; two (2) 750-gpm booster pumps including foundation; associated electrical, structural, controls, and piping; site improvements including drainage, swales, site grading.