Snow Plowing Service 2026-2027 Season RFP
Posted
Sep 29, 2026
Oct 20, 2026
Snow plowing service for the upcoming Winter season, from November 1, 2026, to October 31, 2027. Bloomington Fire Station: If less than 2" or more than 1 1/2" of snow falls, the bays and parking lot must be cleared of ice or snow. After 2" of snow has fallen, engine bays and parking areas must be plowed/cleared for every additional 2" that accumulate. The sidewalks, shedpad, fuel tank, water fill area, and generator access must be cleared after each storm. The sidewalks and bay areas are to be salted with magic salt provided by the contractor. In the event of any ice storm, salt is to be applied to the bay area, parking lot, and walkways. There shall be no snow or ice pushed against the retaining wall near the bay doors. Binnewater Station: The same specifications apply, excluding the fuel area and generator. At the end of the season, all plow debris and any plow damage must be repaired. Bids will be binding for the Winter Season 2026-2027 as specified in the contract.
