Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Blacksburg-Virginia Polytechnic Institute Sanitation Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Blacksburg-Virginia Polytechnic Institute Sanitation Authority
Replacement of the existing non-potable water pumps with higher capacity vertical turbine pumps with control panels, variable frequency drives (VFDs), level transmitter, and discharge pressure transmitter; replacement of the existing 10" and 30" sluice gates in the secondary clarifier splitter box (Junction Box No. 2); replacement of the sludge/scum collection equipment for Primary Clarifier Nos. 1 and 2 and Secondary Clarifier Nos. 1 and 2 and associated bridges, handrails, center column, feedwell, energy dissipating inlet, baffles, weirs, scum box, and regrouting of clarifier bottom; replacement of the aerated grit chamber equipment in three existing chambers including blowers, bucket elevator, screw conveyor, grit dewatering screw, control panels, air headers, coarse bubble diffusers, aeration swing/swivel joint assemblies, valves, electrical conduits, conductors, and control panels; replacement of the existing primary scum pumping and grinders including concrete equipment pads, VFDs, pressure switches, control panels, priming systems, piping, fittings, valves, and associated appurtenances; replacement of the existing waste activated sludge (WAS) pumps located within Recirculation Pump Station No. 1 with new vertical close-coupled, solids-handling, centrifugal pumps with concrete equipment pads, VFDs, pressure switches, control panels, priming systems, piping, fittings, valves, supports, and associated appurtenances; and, expanding the plant-wide Supervisory Control and Data Acquisition (SCADA) System by integrating the operating and alarm signals from existing unit processes/areas including but not limited to screens, influent pumping, grit, primary clarification, aeration, secondary clarification, RAS pump stations, UV, nonpotable system, and solids processing.
Posted Date
Sep 13, 2025
Due Date
Oct 15, 2025
Release: Sep 13, 2025
Blacksburg-Virginia Polytechnic Institute Sanitation Authority
Close: Oct 15, 2025
Replacement of the existing non-potable water pumps with higher capacity vertical turbine pumps with control panels, variable frequency drives (VFDs), level transmitter, and discharge pressure transmitter; replacement of the existing 10" and 30" sluice gates in the secondary clarifier splitter box (Junction Box No. 2); replacement of the sludge/scum collection equipment for Primary Clarifier Nos. 1 and 2 and Secondary Clarifier Nos. 1 and 2 and associated bridges, handrails, center column, feedwell, energy dissipating inlet, baffles, weirs, scum box, and regrouting of clarifier bottom; replacement of the aerated grit chamber equipment in three existing chambers including blowers, bucket elevator, screw conveyor, grit dewatering screw, control panels, air headers, coarse bubble diffusers, aeration swing/swivel joint assemblies, valves, electrical conduits, conductors, and control panels; replacement of the existing primary scum pumping and grinders including concrete equipment pads, VFDs, pressure switches, control panels, priming systems, piping, fittings, valves, and associated appurtenances; replacement of the existing waste activated sludge (WAS) pumps located within Recirculation Pump Station No. 1 with new vertical close-coupled, solids-handling, centrifugal pumps with concrete equipment pads, VFDs, pressure switches, control panels, priming systems, piping, fittings, valves, supports, and associated appurtenances; and, expanding the plant-wide Supervisory Control and Data Acquisition (SCADA) System by integrating the operating and alarm signals from existing unit processes/areas including but not limited to screens, influent pumping, grit, primary clarification, aeration, secondary clarification, RAS pump stations, UV, nonpotable system, and solids processing.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.