Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Bishop Paiute Tribe
A qualified contractor capable of providing turnkey broadband deployment services including but not limited to outside plant construction, fiber installation, network equipment installation, and project coordination for the shovel-ready phase of their NTIA-funded TBCP2 project. This construction project consists of approx. fifteen (15) miles of underground fiber connecting a total of one-hundred thirty three (133) service locations.
Posted Date
Mar 28, 2026
Due Date
Apr 19, 2026
Release: Mar 28, 2026
Bishop Paiute Tribe
Close: Apr 19, 2026
A qualified contractor capable of providing turnkey broadband deployment services including but not limited to outside plant construction, fiber installation, network equipment installation, and project coordination for the shovel-ready phase of their NTIA-funded TBCP2 project. This construction project consists of approx. fifteen (15) miles of underground fiber connecting a total of one-hundred thirty three (133) service locations.
Bishop Paiute Tribe
Work includes renovation work will include checking and repairing the roof, electrical work, repair drainage to the outside kennel enclosures, inside walls patched and painted, new flooring, wi-fi cabling, inspect and install new air conditioning and heater systems, and checking the sewer system connection.
Posted Date
Nov 18, 2025
Due Date
Dec 10, 2025
Release: Nov 18, 2025
Bishop Paiute Tribe
Close: Dec 10, 2025
Work includes renovation work will include checking and repairing the roof, electrical work, repair drainage to the outside kennel enclosures, inside walls patched and painted, new flooring, wi-fi cabling, inspect and install new air conditioning and heater systems, and checking the sewer system connection.
Bishop Paiute Tribe
Work includes prep and paint the interior of the gas station. Work includes all prep, painting, and clean up. All painting supplies and equipment are to be supplied by the contractor.
Posted Date
Sep 18, 2025
Due Date
Oct 3, 2025
Release: Sep 18, 2025
Bishop Paiute Tribe
Close: Oct 3, 2025
Work includes prep and paint the interior of the gas station. Work includes all prep, painting, and clean up. All painting supplies and equipment are to be supplied by the contractor.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge