This RFP is for the construction of approximately 26,100 LF of 6-inch PVC C900 water mains, 650 LF of 8-inch PVC C900 water mains, four (4) PRV stations, trench cutoff walls, a new CMU booster pump station, installation of a vertical turbine pump, SCADA integration, PLC programming, and associated appurtenances.
Buyer Attributes
Key metrics and characteristics
City
The city where this buyer is located.
Yucca Valley
County
The county where this buyer is located.
San Bernardino
Address
Physical address of this buyer.
622 Jemez Trl
Phone Number
Contact phone number for this buyer.
(760) 364-2315
Zip Code
Postal code for this buyer's location.
92284
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
CautiousAggressive
Higher is better Unlock
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
ConservativeEarly Adopter
Higher is better Unlock
Startup Friendliness
How often this buyer champions startups and early adoption.
Board meetings and strategic plans from Bighorn-Desert View Water Agency
Bighorn-Desert View Water Agency Finance/Public Relations/Education and Personnel Standing Committee Regular Meeting Minutes
Date: May 19, 2026Type: Meeting mention
The committee reviewed updates to the employee handbook, including proposals for a 4/10 work schedule, definitions of full-time versus part-time status, and policy clarifications on vehicle property listing and jury duty pay. Additionally, the committee discussed a new social media policy aimed at one-way information dissemination through various platforms, with an emphasis on limited engagement and disclaimers. The committee also requested a future agenda item regarding the lifespan assessment of tanks, wells, and pipelines to aid in repair and replacement planning.
Bighorn-Desert View Water Agency Regular Board Meeting Minutes
Date: Aug 11, 2026Type: Meeting mention
The Board of Directors approved a resolution to adopt Cross-Connection Control Plans for the Bighorn-Desert View Water System and the Goat Mountain Water System. Additionally, the Board reviewed and approved disbursements, discussed a potential adjustment to future meeting times, and received reports on agency operations, including infrastructure repairs and conference registrations. The Board held a closed session to conduct performance evaluations for the Chief Engineer and the General Manager, with no reportable actions taken.
Key Contacts
Public-sector contacts connected to Bighorn-Desert View Water Agency.
Bighorn-Desert View Water Agency Committee Meeting Minutes
Date: Feb 18, 2025Type: Meeting mention
The committee reviewed status reports on several water infrastructure projects. Updates included the progress of the Water Meter Replacement Program, the soil assessment plan for the Goat Mountain Replacement Well, surveying and engineering design for the System Interconnection at Winters and Rainbow Road, and critical path elements for the Potable Water Systems Improvements Consolidation, such as encroachment permits, pipeline easement acquisition, and the Western Joshua Tree census.
Extracted from official board minutes, strategic plans, and video transcripts.
Meeting signals
Know what buyers discuss before RFPs drop
Track Bighorn-Desert View Water Agency meetings, strategic plans, and budget discussions before the public bid appears.