Division Well No. 9 Equipping Project
Posted
Aug 17, 2026
Sep 11, 2026
The Division Well No. 9 Equipping Project includes the following: Site grading, site concrete, and construction of a new 24’-0” x 17’-4” CMU building with a chemical storage room; All mechanical and electrical facilities to operate and control a 125 HP vertical turbine well pumping plant; CMU wall, automated cantilever gate system, and site paving.