SW Nutmeg Drainage Improvements
Aug 9, 2026
Closes
Sep 3, 2026
The project scope is to remove existing small diameter storm sewer pipes and to replace them with an 8'x3' box culvert, regrade a detention pond and downstream channel. The project will require the relocation of water and sanitary sewer utilities, the construction of new storm inlets and junction boxes, as well as street, sidewalk, and driveway replacement.