Belton-Honea Path Water Authority - WTP High Service Pumping Improvements
Posted
Sep 23, 2026
Oct 22, 2026
The work will consist of improvements to the existing high service pumping capabilities at the Water Filtration Plant as follows: 1. Installation of a vertical turbine pump capable of conveying 2,800 gallons per minute (GPM) at 325 feet total dynamic head (TDH). 2. Installation process piping and valves. 3. All related instrumentation, electrical equipment and wiring.
