Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Barron Light and Water's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Barron Light and Water
Substation relay/control panels.
Posted Date
May 14, 2025
Due Date
Jun 9, 2025
Release: May 14, 2025
Barron Light and Water
Close: Jun 9, 2025
Substation relay/control panels.
Barron Light and Water
Supply and delivery of Two (2) 69kV circuit breakers.
Posted Date
Apr 9, 2025
Due Date
Apr 28, 2025
Release: Apr 9, 2025
Barron Light and Water
Close: Apr 28, 2025
Supply and delivery of Two (2) 69kV circuit breakers.
Barron Light and Water
Modifications to the existing Lift Station Building such as heating and ventilation equipment replacement, blower and blower piping removal, electrical equipment removals, removal of process piping and pumps, providing new process piping and pumps, water piping, water fill station, heating and ventilation, electrical, and wetwell modifications. Provide a new screen and grit building complete and generally including new screen and grit removal equipment and all earthwork, structural, architectural, mechanical and plumbing, electrical and controls, process, and appurtenant work. Also providing site work generally including forcemain piping, water piping, new electrical service, natural gas piping, process piping, drain tile piping, sanitary sewer piping, driveway and parking area work and grading. Project also includes providing a new control panel for two (2) existing lift stations and a new SCADA panel for seven (7) existing lift stations located throughout the City of Barron’s wastewater collection system.
Posted Date
Jan 21, 2025
Due Date
Feb 18, 2025
Release: Jan 21, 2025
Barron Light and Water
Close: Feb 18, 2025
Modifications to the existing Lift Station Building such as heating and ventilation equipment replacement, blower and blower piping removal, electrical equipment removals, removal of process piping and pumps, providing new process piping and pumps, water piping, water fill station, heating and ventilation, electrical, and wetwell modifications. Provide a new screen and grit building complete and generally including new screen and grit removal equipment and all earthwork, structural, architectural, mechanical and plumbing, electrical and controls, process, and appurtenant work. Also providing site work generally including forcemain piping, water piping, new electrical service, natural gas piping, process piping, drain tile piping, sanitary sewer piping, driveway and parking area work and grading. Project also includes providing a new control panel for two (2) existing lift stations and a new SCADA panel for seven (7) existing lift stations located throughout the City of Barron’s wastewater collection system.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.