2026 IDIQ Chilled Water Construction In The ROW Reissue
Posted
-
Oct 15, 2026
Installation of chilled water piping and related infrastructure within the right of way to connect new customers. Work includes excavation, tunneling, dewatering, traffic control, and integration with existing systems.
