Woodcreek Waterline Phase 4 RFP
Posted
-
Nov 19, 2026
Work includes replacement for approx. 4,020 LF of waterline, and overlaying the entire road with 2" asphalt. Work includes 2,326 LF revegetation; 1,861 CY flowable fill; 4,020 LF 8" pvc awwa c900 dr-18*; 143 LF replace 3" waterline; 24 LF replace and/or extend 6" waterline; 11,629 SY 2" asphalt roadway overlay; 36 EA service connections; 33 EA asphalt approaches to driveway; 20 EA 8" gate valves with restraint joints1; 5 EA cut and plug existing 3" waterline. See attached file.
