Train Station Area Pedestrian Accessibility Improvements RFP
Jul 30, 2026
Closes
Aug 27, 2026
Work consists of 200 LF, cut concrete sidewalk; 30 SY, removal of concrete sidewalk; 6EA, sediment control system at catch basin; 215 SY, bituminous concrete patching - pavement reconstruction; 425 LF, joint and crack sealing of bituminous concrete pavement; 210 LF, 6" x 18" granite stone curbing; 110 LF, 6" x 18" granite curved stone curbing; 1670 SF, concrete sidewalk; 560 SF, concrete sidewalk ramp; 25 SY, bituminous concrete driveway; 70 SY, furnishing and placing topsoil; 275 LF, pedestrian barricade; 1 LS, removal and relocation of existing signs; 100 LF, 4" white epoxy resin pavement markings. See attached files.