Ne Union Hill Road and 40th Street Joint Utility Replacement
Posted
Sep 10, 2026
Sep 24, 2026
Work consists of 1 LS Erosion Control; 1 LS Project Temporary Traffic Control; 1,400 LF Sawcutting; 200 TN Temporary HMA; 1,730 SY Planing Bituminous Pavement; 1,310 LF 8" DI Waterline (Incl. Fittings and Pipe Bedding); 7 EA 8" Gate Valves; 5 EA Connection to Existing Water Main; 15 LF 2" Water Service Pipe.
