Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Ambridge Borough Municipal (Sewer) Authority
Work includes 141 LF 15 inch pvc pipe, 14 - 16' depth. Includes penndot no. 2a coarse aggregate backfill (no slag) and compaction (complete-in-place); 2 EA connect to existing manholes (as directed); 4 EA new manhole frame and cover (complete-in-place); 4 VF rehabilitate existing manhole. Includes the application of patching mix, infiltration control mix and liner materia; 2 EA modify existing manhole invert; 368 LF 12 inch cured-in-place (cipp). Includes cleaning, root removal, and pre and post lining cctv inspections. ; 804 LF 21" cured-in-place (cipp). Includes cleaning, root removal, and pre and post lining cctv inspections; 2 EA service lateral cutouts; 65 EA replace/install manhole steps.
Posted Date
-
Due Date
Jun 29, 2026
Ambridge Borough Municipal (Sewer) Authority
Close: Jun 29, 2026
Work includes 141 LF 15 inch pvc pipe, 14 - 16' depth. Includes penndot no. 2a coarse aggregate backfill (no slag) and compaction (complete-in-place); 2 EA connect to existing manholes (as directed); 4 EA new manhole frame and cover (complete-in-place); 4 VF rehabilitate existing manhole. Includes the application of patching mix, infiltration control mix and liner materia; 2 EA modify existing manhole invert; 368 LF 12 inch cured-in-place (cipp). Includes cleaning, root removal, and pre and post lining cctv inspections. ; 804 LF 21" cured-in-place (cipp). Includes cleaning, root removal, and pre and post lining cctv inspections; 2 EA service lateral cutouts; 65 EA replace/install manhole steps.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge