Summary
Work includes 141 LF 15 inch pvc pipe, 14 - 16' depth. Includes penndot no. 2a coarse aggregate backfill (no slag) and compaction (complete-in-place); 2 EA connect to existing manholes (as directed); 4 EA new manhole frame and cover (complete-in-place); 4 VF rehabilitate existing manhole. Includes the application of patching mix, infiltration control mix and liner materia; 2 EA modify existing manhole invert; 368 LF 12 inch cured-in-place (cipp). Includes cleaning, root removal, and pre and post lining cctv inspections. ; 804 LF 21" cured-in-place (cipp). Includes cleaning, root removal, and pre and post lining cctv inspections; 2 EA service lateral cutouts; 65 EA replace/install manhole steps.