Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Aliquippa Municipal Water Authority
Work included under Contract No. 26-W1 - Elevated Water Storage Tank and Valve Vault includes the installation of a level control valve vault at the existing Raccoon Elevated Water Storage Tank. The project also includes approximately 100 linear feet of relocation and abandonment of the existing waterline connecting the distribution system to the elevated storage tank, as well as the installation of SCADA provisions for monitoring the Raccoon Elevated Storage Tank, Raccoon Booster Station and First Alley Booster Station at the existing Water Filtration Plant. Work includes, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment and performing all work necessary to complete all General Construction in accordance with the Contract Documents.
Posted Date
Feb 23, 2026
Due Date
Mar 27, 2026
Release: Feb 23, 2026
Aliquippa Municipal Water Authority
Close: Mar 27, 2026
Work included under Contract No. 26-W1 - Elevated Water Storage Tank and Valve Vault includes the installation of a level control valve vault at the existing Raccoon Elevated Water Storage Tank. The project also includes approximately 100 linear feet of relocation and abandonment of the existing waterline connecting the distribution system to the elevated storage tank, as well as the installation of SCADA provisions for monitoring the Raccoon Elevated Storage Tank, Raccoon Booster Station and First Alley Booster Station at the existing Water Filtration Plant. Work includes, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment and performing all work necessary to complete all General Construction in accordance with the Contract Documents.
AvailableAliquippa Municipal Water Authority
The project includes approx. 150 LF of 8" DIP and 90 LF of 8" PVC replacement gravity sanitary sewer, soil nails / rock anchors, above ground and below ground installation, and all appurtenances such as manholes, wye connections and site tees, reconnection of all building service sewers and lateral connections, and all necessary appurtenances and restoration for said construction.
Posted Date
Jan 16, 2026
Due Date
Mar 18, 2026
Release: Jan 16, 2026
Aliquippa Municipal Water Authority
Close: Mar 18, 2026
The project includes approx. 150 LF of 8" DIP and 90 LF of 8" PVC replacement gravity sanitary sewer, soil nails / rock anchors, above ground and below ground installation, and all appurtenances such as manholes, wye connections and site tees, reconnection of all building service sewers and lateral connections, and all necessary appurtenances and restoration for said construction.
AvailableAliquippa Municipal Water Authority
Provide maintenance of sanitary sewer collection system.
Posted Date
Oct 28, 2025
Due Date
Nov 19, 2025
Release: Oct 28, 2025
Aliquippa Municipal Water Authority
Close: Nov 19, 2025
Provide maintenance of sanitary sewer collection system.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Aliquippa Municipal Water Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database