Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
693C73 Eastern Federal Lands Division
PIV card reader system upgrade.
Posted Date
May 26, 2026
Due Date
Jun 5, 2026
Release: May 26, 2026
693C73 Eastern Federal Lands Division
Close: Jun 5, 2026
PIV card reader system upgrade.
693C73 Eastern Federal Lands Division
This project consists of repairing various damaged sites on Spring Creek Road (FS 27) and Citico Creek Road (FS 35-1). Project work includes grading, roadway resurfacing, drain dip construction, replacement of drainage culverts, drainage culvert cleaning, ditch reconditioning, slope stabilization repairs, and other miscellaneous work.
Posted Date
Apr 28, 2026
Due Date
Jun 16, 2026
Release: Apr 28, 2026
693C73 Eastern Federal Lands Division
Close: Jun 16, 2026
This project consists of repairing various damaged sites on Spring Creek Road (FS 27) and Citico Creek Road (FS 35-1). Project work includes grading, roadway resurfacing, drain dip construction, replacement of drainage culverts, drainage culvert cleaning, ditch reconditioning, slope stabilization repairs, and other miscellaneous work.
Available693C73 Eastern Federal Lands Division
Sealed bids from certified Small Business concerns are being solicited to replace a wooden bridge and repair flood damage at Sandy Point National Wildlife Refuge in St. Croix, U.S. Virgin Islands. The project involves structural excavation and site restoration with an estimated value under $250,000. All solicitation documents are available for download on the official SAM.gov website.
Posted Date
May 5, 2026
Due Date
Jun 4, 2026
Release: May 5, 2026
693C73 Eastern Federal Lands Division
Close: Jun 4, 2026
Sealed bids from certified Small Business concerns are being solicited to replace a wooden bridge and repair flood damage at Sandy Point National Wildlife Refuge in St. Croix, U.S. Virgin Islands. The project involves structural excavation and site restoration with an estimated value under $250,000. All solicitation documents are available for download on the official SAM.gov website.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
693C73 Eastern Federal Lands Division
PROJECT NP-GRSM 13(1), 14(2), 18(1) THE PROJECT CONSISTS OF THE RESURFACING OF APPROXIMATELY 5.33 MILES OF FIGHTING CREEK GAP ROAD FROM MILEPOST 0.00 TO 4.97, APPROXIMATELY 12.58 MILES OF LITTLE RIVER GORGE ROAD FROM MILEPOST 0.00 TO 12.58, APPROXIMATELY 1.53 MILES OF ELKMONT ROAD FROM MILEPOST 0.00 TO 1.53, INCLUDING PARKING AREAS AND PULL-OFFS, AND REHABILITATION OF SUGARLANDS VISITOR CENTER AREA. THE WORK INCLUDES ASPHALT PAVEMENT PATCHING, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY, AN ULTRA-THIN BONDED WEARING COURSE, SHOULDER AND DITCH RECONDITIONING, PERMANENT PAVEMENT MARKINGS, AND OTHER MISCELLANEOUS WORK.
Effective Date
Dec 18, 2018
Expires
Effective: Dec 18, 2018
693C73 Eastern Federal Lands Division
Expires:
PROJECT NP-GRSM 13(1), 14(2), 18(1) THE PROJECT CONSISTS OF THE RESURFACING OF APPROXIMATELY 5.33 MILES OF FIGHTING CREEK GAP ROAD FROM MILEPOST 0.00 TO 4.97, APPROXIMATELY 12.58 MILES OF LITTLE RIVER GORGE ROAD FROM MILEPOST 0.00 TO 12.58, APPROXIMATELY 1.53 MILES OF ELKMONT ROAD FROM MILEPOST 0.00 TO 1.53, INCLUDING PARKING AREAS AND PULL-OFFS, AND REHABILITATION OF SUGARLANDS VISITOR CENTER AREA. THE WORK INCLUDES ASPHALT PAVEMENT PATCHING, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY, AN ULTRA-THIN BONDED WEARING COURSE, SHOULDER AND DITCH RECONDITIONING, PERMANENT PAVEMENT MARKINGS, AND OTHER MISCELLANEOUS WORK.
693C73 Eastern Federal Lands Division
NASA WALLOPS ISLAND CAUSEWAY BRIDGE OVER CAT CREEK, PROJECT NO. VA ST NASA 1(9) - THIS PROJECT CONSISTS OF THE DESIGN AND REPLACEMENT OF THE EXISTING WALLOPS ISLAND CAUSEWAY BRIDGE OVER CAT CREEK, IN ACCOMACK COUNTY, VIRGINIA. THIS STRUCTURE IS OWNE
Effective Date
Jul 18, 2024
Expires
Effective: Jul 18, 2024
693C73 Eastern Federal Lands Division
Expires:
NASA WALLOPS ISLAND CAUSEWAY BRIDGE OVER CAT CREEK, PROJECT NO. VA ST NASA 1(9) - THIS PROJECT CONSISTS OF THE DESIGN AND REPLACEMENT OF THE EXISTING WALLOPS ISLAND CAUSEWAY BRIDGE OVER CAT CREEK, IN ACCOMACK COUNTY, VIRGINIA. THIS STRUCTURE IS OWNE
Available693C73 Eastern Federal Lands Division
PROJECT NP SER PMS FY24(1): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS AND PARKING AREAS. THE WORK INCLUDES TYPE 2 MICRO SURFACING, SAMI, THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, FULL DEPTH PATCHING, AND OTHER MI
Effective Date
Nov 14, 2024
Expires
Effective: Nov 14, 2024
693C73 Eastern Federal Lands Division
Expires:
PROJECT NP SER PMS FY24(1): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS AND PARKING AREAS. THE WORK INCLUDES TYPE 2 MICRO SURFACING, SAMI, THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, FULL DEPTH PATCHING, AND OTHER MI
AvailableSee expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Division Director, Eastern Federal Lands Highway Division
Premium
Access the largest public sector contact database
© 2026 Starbridge