Description: 2 EA, pole, sg, 080 ft, h9, 0716 ft-kips steel pole, 80 feet in length, minimum 0716 ft-kips capacity @ g. L. (class h9 equivalent). Hot dipped galvanized in accordance with astm a123. Details and drilling shall be in accordance with latest version of nes specification lsk-1230.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
400 EA, pole, wd, 040 ft, c4, 0076 ft-kips 40 ft. Class 4, treated pole, to be either (a) southern pine in accordance with nes specification 33-151r13 or (b) douglas fir in accorance with nes specification 33-252r10. All poles shall be roofed and gained in accordance with nes drawing 910. These poles are for shipment to various yards in nashville, tn, as released by purchaser via truck freight.
135 EA, pole, wd, 045 ft, c2, 0135 ft-kips 45 ft. Class 2, treated pole to be either (a) southern pine in accordance with nes specification 33-151r13 or (b) douglas fir in accordance with nes specification 33-252r10. All poles shall be roofed and gained in accordance with nes drawing 910. These poles are for shipment to various yards in nashville, tn, as released by purchaser via truck freight.
From the first pre-RFP signals to the published RFP and its files.
1 file available
Board meeting
510 days before RFP
The FY2026 budget materials proposed $31.1 million for asset-management work, including planned pole replacements.
See sourceHide source
System Construction Plan - Asset Management This category provides funding for planned projects to replace existing infrastructure due to age and condition for transmission line, substation, communication and distribution projects. The Fiscal Year 2026 budget is $31.1 million compared to a budget of $29.3 million in Fiscal Year 2025. The increase of $1.8…
NES management planned to evaluate stronger line construction, materials and system resilience through a comprehensive 10-year reliability plan.
See sourceHide source
>> Yeah, so that that is part of that comprehensive 10-year plan. And it includes not just vegetation management, how we design. We are right now in a national electric safety code zone of what level of ice we might have to prepare for. We're going to evaluate is that the right level that we might want to go to that next level. Is there something about how…
NES's reliability plan presented $25.0 million for FY27 pole replacements and substations, rising to $181.9 million across FY27-FY31.
See sourceHide source
Reliability Spend • Maintaining a reliable electric system for customers is a primary objective of NES and is supported by the budget in the current year and beyond. The current NES financial plan also emphasizes the importance of investing in these reliability initiatives. The following shows the amounts allocated for reliability initiatives over the next…
Management proposed purchasing 21 galvanized H7 steel poles, 90 feet long, from Stuart C. Irby.
See sourceHide source
Recommendation of Purchases and Contracts at the Meeting on Wednesday September 23, 2026 Management recommends Board approval of the following purchases and contracts: Total Materials and Supplies Purchases $782,160.00 Total Contracts and Services $4,257,479.50 Total Additions, Extensions, and Changes $8,150,000.00 Total Ratified Purchases and Contracts…
Electric Power Board of the Metropolitan Government of Nashville and Davidson County Meeting Minutes