Summary
The contractor shall: Complete general construction, alterations, demolition, paving, grading, drainage, interior demolition and restoration, and infection control necessary removal of existing
structures and construction and certain other items to replace the existing domestic and fire water infrastructure with a new system designed to meet the current VA standards and reduce service interruptions, accommodate future construction, and rectify existing water service problems on the Columbia VAMC campus. Take all the necessary precautions to prevent damage outside the specified work area, including but not limited to the following: public and private roads, fences, access areas, vehicles, utilities, and existing VA facilities. Be financially responsible to make restoration to the original condition in the event of
damage resulting from contractor activity. Ensure any work taking place adjacent to the existing facility is performed in such a
way as to prevent damage to the existing facility, including but not limited to bricks, windows, doors, existing fascia or cornice work, columns, and panels. See attached file.