Mobile CT Scanner for Longview TX VA Medical CBOC RFP
Posted
Oct 27, 2026
Nov 2, 2026
Mobile CT Scanner.
Track open bid opportunities, contracts, public meetings, and key contacts for 256-Network Contract Office 16 (36C256).
Active opportunities open for bidding
Posted
Oct 27, 2026
Nov 2, 2026
Mobile CT Scanner.
Posted
Oct 27, 2026
Nov 3, 2026
Document Destruction Services (Shredding).
Posted
Oct 26, 2026
Nov 16, 2026
This project includes a new elevated water storage tank. The new tank installation shall include all labor and materials required for a complete and operational system including, but not limited to, supporting structure, piping, appurtenances, and accessories as required. The existing elevated 250,000-gallon water tower shall be demolished in its entirety including all below grade supporting structure, piping vaults, etc. The demolition shall be in strict accordance with the phasing schedule. A new pump house with new pumps and new pump controls is included in this project. Physical and operational security, monitoring, controls, redundancy and emergency power are included. The new pump house installation shall include all labor and materials required for a complete and operational system including, but not limited to, structure, fence, paving, piping, cameras, access control, emergency generator, appurtenances, and accessories as required. A new automated control system that interlocks to and also controls the existing south pump house as well as the new north pump house is included in this project. The new system shall be seamlessly integrated into the existing automation system currently operating the south pump house. This project also replaces all existing, failing cast iron, ductile iron, galvanized, asbestos cement, and/or any other material water pipe with new pipe as shown on the project plans. The water supply lines are generally looped to improve supply redundancy and improve the water pressure. Additionally, new backflow preventers shall be installed on the Fire Protection supply lines to buildings which have fire protection systems. This installation will include pressure testing, disinfecting, and hyper-chlorinating as required for new piping installation per Federal, State, and Local codes.
Key metrics and characteristics
City
The city where this buyer is located.
Ridgeland
County
The county where this buyer is located.
Madison
Address
Physical address of this buyer.
715 South Pear Orchard Rd., Plaza 1
Zip Code
Postal code for this buyer's location.
39157
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
Startup Friendliness
How often this buyer champions startups and early adoption.
Latest Budget Year
Unlock to view
Operating Budget
Unlock to view
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
AI-ranked best-fit opportunities before bid boards
Auto-drafted, compliance-ready outlines & boilerplate
Competitor & pricing intel from past awards
Procurement guidance and navigation tips.
These are suggested options, not confirmed memberships or past purchases. Our team can help confirm the right purchasing path for this agency.


Track vendor wins and renewal opportunities
VISN-WIDE BPA FOR AUTOMATED MICROBIOLOGICAL BLOOD CULTURE TESTING EQUIPMENT, REAGENTS AND SUPPLIES.
CANON CT PM
PURCHASE MEDICAL AIR SYSTEM
PROSTHETIC ORDER
EHRM PROJECT MANAGEMENT-BILOXI TASK ORDER FY24
Native sync to Salesforce & HubSpot
See expiring contracts, renewal timing, pricing history, and competitor awards, then sync the data to your CRM.
Expiring contracts, renewals, and award history
Competitor contract data and source files
Budget and spend signals to prioritize accounts
Native sync to Salesforce and HubSpot