Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Auditorium Marquee.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Dec 19, 2025
Close: Jan 30, 2026
Auditorium Gymnasium Floor Resurface.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Auditorium Stage Lights.
Posted Date
Dec 19, 2025
Due Date
Jan 30, 2026
Release: Dec 19, 2025
Close: Jan 30, 2026
Auditorium Stage Lights.
AvailableWork consists of new replacement display for the marquee at the airport entrance. This display will be viewable from both sides and shall be approximately 4ft 8 inches by 8 ft in size and consist of 10mm led display providing 281 trillion RGB colors. The display will fit into an existing cabinet that is 8ft 4 in by 5 ft in size. The existing logo on the cabinet structure will be replaced in the form of a laser cut brushed aluminum logo that is backlit. The existing sign structure will remain as-is. To prevent damage due to vandalism with thrown projectiles, a sufficiently thick plexiglass panel will be provided and installed over the led display on both sides. Wireless radio ore cell modem communication is required to allow airport staff ease in updating display.
Posted Date
Nov 13, 2025
Due Date
Jan 13, 2026
Release: Nov 13, 2025
Close: Jan 13, 2026
Work consists of new replacement display for the marquee at the airport entrance. This display will be viewable from both sides and shall be approximately 4ft 8 inches by 8 ft in size and consist of 10mm led display providing 281 trillion RGB colors. The display will fit into an existing cabinet that is 8ft 4 in by 5 ft in size. The existing logo on the cabinet structure will be replaced in the form of a laser cut brushed aluminum logo that is backlit. The existing sign structure will remain as-is. To prevent damage due to vandalism with thrown projectiles, a sufficiently thick plexiglass panel will be provided and installed over the led display on both sides. Wireless radio ore cell modem communication is required to allow airport staff ease in updating display.
AvailableWork consists of new replacement display for the marquee at the airport entrance. This display will be viewable from both sides and shall be approximately 4ft 8 inches by 8 ft in size and consist of 10mm led display providing 281 trillion RGB colors. The display will fit into an existing cabinet that is 8ft 4 in by 5 ft in size. The existing logo on the cabinet structure will be replaced in the form of a laser cut brushed aluminum logo that is backlit. The existing sign structure will remain as-is. To prevent damage due to vandalism with thrown projectiles, a sufficiently thick plexiglass panel will be provided and installed over the led display on both sides. Wireless radio ore cell modem communication is required to allow airport staff ease in updating display.
Posted Date
Nov 13, 2025
Due Date
Jan 13, 2026
Release: Nov 13, 2025
Close: Jan 13, 2026
Work consists of new replacement display for the marquee at the airport entrance. This display will be viewable from both sides and shall be approximately 4ft 8 inches by 8 ft in size and consist of 10mm led display providing 281 trillion RGB colors. The display will fit into an existing cabinet that is 8ft 4 in by 5 ft in size. The existing logo on the cabinet structure will be replaced in the form of a laser cut brushed aluminum logo that is backlit. The existing sign structure will remain as-is. To prevent damage due to vandalism with thrown projectiles, a sufficiently thick plexiglass panel will be provided and installed over the led display on both sides. Wireless radio ore cell modem communication is required to allow airport staff ease in updating display.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →