Retrieving RFP details
Release
Close
256-Network Contract Office 16 (36C256)
Medical Gas Deficiencies. A new underground communication line will be run between the main hospital building at the Little Rock (JLM) Campus and the adjacent storage tanks at the northeast portion of the facility. The existing pavement will be removed and replaced for the installation of the new communication line. At the building entry location there is currently a temporary construction fence and mechanical equipment that will require coordination to accommodate installation. A new underground communication line will be run between buildings 69 and 170. Installation will involve crossing an existing roadway. The existing sidewalk, pavement, curb and gutter will be removed and replaced for the installation of the new communication line. The proposed route will also run adjacent to an existing enclosure for liquid oxygen. The main oxygen shutoff valve and check valves in the chiller plant at the JLM campus will be replaced, and additional shutoff valves will be provided to allow for a temporary connection to oxygen bottles while system maintenance is being performed. Temporary oxygen will be provided, as needed, during shutdown at the zone valve level.
North Carolina State University At Raleigh
Provide ada and code deficiencies at hall.
Alaska Regional Office (97000)
Provide glba correct medium voltage deficiencies.
242-Network Contract Office 02 (36C242)
Correct FCA D & F deficiencies boiler plant. The work shall include work covered by specification divisions 1 (general conditions), 2 (existing conditions), 3 (concrete), 5 (metals), 6 (wood, plastics and composites), 7 (thermal and moisture protection), 9 (finishes), 13 (Seismic Restraint Requirements for Non-Structural Components), 22 (plumbing), 23 (HVAC), 26 (electrical), and 31 (earthwork). See attached file.
Release
Oct 23, 2025
Close
Dec 12, 2025