Summary
Boat Launch Project: a) Mobilization to the site and staging. b) Material purchase and installation of temporary erosion and sediment control measures per the approved Erosion and Sediment Control Plan; not including the coffer dam bypass system, per the plan drawings and specifications. c) Demolition and site preparation for proposed project items; including land clearing, rough grading, and preparation of grades at the proposed boat launch; not including placement of the coffer dam bypass system and removal of the existing, concrete, non-motorized boat launch ramp per the plan drawings and specifications. d) Material purchase and installation of the proposed coffer dam bypass system, and the demolition and removal of the existing, concrete, non-motorized boat launch ramp, per the plan drawings and specifications. e) Material purchase and installation of the cast in place concrete boat launch, per the plan drawings and specifications. f) Preparation of the existing compacted gravel drive and parking area(s) for asphalt paving, per the plan drawings and specifications. g) Preparation of the existing asphalt drive to be resurfaced, per the plan drawings and specifications. h) Preparation, material purchase and installation of the grass median(s), per the plan drawings and specifications.
i) Material purchase and asphalt paving of the existing compacted gravel drive and parking area(s) per the plan drawings and specifications. j) Material purchase and asphalt paving of the existing asphalt drive to be resurfaced, per the plan drawings and specifications. k) Material purchase and installation of the two sided boat launch sign, per the plan drawings and specifications.
l) Material purchase and installation of the boot cleaning station, per the plan drawings and specifications. m) Material purchase and installation of the split rail fence, including footings, and stain and sealer; per the plan drawings and specifications. n) Material purchase and installation of the wheel stop(s), per the plan drawings and specifications. o) Material purchase installation of the parking line paint, per the plan drawings and specifications. p) Final topsoil grading, rolling, seeding, and mulching of any remaining disturbed area, per the plan drawings and specifications. q) The removal of all construction materials; including all temporary erosion and sediment control BMPs.