Summary
This project consists of the replacement and upgrade of key pumping and support systems. Work includes removing and replacing three (3) Return Activated Sludge (RAS) pumps, two (2) Waste Activated Sludge (WAS) pumps, and three (3) Filter Feed pumps, along with associated ductile iron piping, stainless steel and ductile iron fittings. The project also includes construction of new concrete pump mounting pads, replacement of level instrumentation and the instrumentation control panel, and integration with the SCADA system. Additional improvements include the replacement of the existing aluminum access hatch and upgrades to electrical disconnects and associated wiring for all replaced pumps.