Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnishing, programming, configuring, installing, testing, and placing into full operational service a complete Supervisory Control and Data Acquisition (SCADA) system as specified in the Contract Documents. Work under this item includes all hardware, software, communications equipment, panels, PLCs, HMIs, networking components, instruments, interfaces, graphics development, databases, logic programming, alarms, historian configuration, installation, start-up, commissioning, training, documentation, and all incidental materials and labor necessary to provide a fully functional and integrated system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Southampton County, Virginia, is seeking bids for an Invitation for Bid (IFB) regarding wastewater treatment plant (WWTP) upgrades and improvements with a substantial infrastructure renovation project. The procurement opportunity focuses on comprehensive upgrades to the existing 4.0 MGD treatment facility, with specific improvements targeting pretreatment, primary and secondary clarifiers, and the shop building. Key project deliverables include replacing screening and grit equipment, upgrading pumps and blowers with variable frequency drives (VFDs), installing new flow meters and samplers, rehabilitating clarifier access bridges, and modernizing electrical systems.
Posted Date
Dec 29, 2025
Due Date
Jan 12, 2026
Release: Dec 29, 2025
Close: Jan 12, 2026
Southampton County, Virginia, is seeking bids for an Invitation for Bid (IFB) regarding wastewater treatment plant (WWTP) upgrades and improvements with a substantial infrastructure renovation project. The procurement opportunity focuses on comprehensive upgrades to the existing 4.0 MGD treatment facility, with specific improvements targeting pretreatment, primary and secondary clarifiers, and the shop building. Key project deliverables include replacing screening and grit equipment, upgrading pumps and blowers with variable frequency drives (VFDs), installing new flow meters and samplers, rehabilitating clarifier access bridges, and modernizing electrical systems.
AvailableProject generally consists of improvements to the existing pretreatment building including replacement of screening equipment, grit equipment, pumps and blowers (including vfds), influent sampler(s), flow meter(s), gates and valves, and associated piping along with renovation of existing pre-engineered metal building (including hvac improvements), installation of new bollards, and electrical improvements; See attached file.
Posted Date
Dec 3, 2025
Due Date
Jan 12, 2026
Release: Dec 3, 2025
Close: Jan 12, 2026
Project generally consists of improvements to the existing pretreatment building including replacement of screening equipment, grit equipment, pumps and blowers (including vfds), influent sampler(s), flow meter(s), gates and valves, and associated piping along with renovation of existing pre-engineered metal building (including hvac improvements), installation of new bollards, and electrical improvements; See attached file.
Project consists of the following improvements: headworks maintenance upgrades including new mechanical gates, channel extension, and semi enclosed building; new secondary clarifier effluent trough launder covers; alum feed system replacement and controls upgrades; splitter box maintenance upgrades including new mechanical gates; new tertiary filters and equipment building; new uv disinfection system; new non-potable water system; sludge transfer pump replacement; new effluent parshall flume; general plant control system and scada upgrades; miscellaneous plant site improvements & yard piping. See outside link.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
Project consists of the following improvements: headworks maintenance upgrades including new mechanical gates, channel extension, and semi enclosed building; new secondary clarifier effluent trough launder covers; alum feed system replacement and controls upgrades; splitter box maintenance upgrades including new mechanical gates; new tertiary filters and equipment building; new uv disinfection system; new non-potable water system; sludge transfer pump replacement; new effluent parshall flume; general plant control system and scada upgrades; miscellaneous plant site improvements & yard piping. See outside link.
Procurement of services from qualified radio-frequency (RF) engineering firms for the inspection, testing, optimization, and upgrade of radios within Thornton's water infrastructure SCADA system.
Posted Date
Dec 17, 2025
Due Date
Jan 28, 2026
Release: Dec 17, 2025
Close: Jan 28, 2026
Procurement of services from qualified radio-frequency (RF) engineering firms for the inspection, testing, optimization, and upgrade of radios within Thornton's water infrastructure SCADA system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis