Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of sandblasting and painting of steel appurtenances on four final clarifier tanks at the waste water treatment plant.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide sandblasting, inspection, repair, and re-painting of sectional barge.
Posted Date
Dec 1, 2025
Due Date
Dec 22, 2025
Release: Dec 1, 2025
Close: Dec 22, 2025
Provide sandblasting, inspection, repair, and re-painting of sectional barge.
AvailablePremium
Access the largest public sector contact database
The Borough of Caldwell (Essex County, NJ) is soliciting sealed bids for the Clarifier Retrofit Project at the Caldwell Wastewater Treatment Plant, including partial demolition and modification to existing sludge collector equipment in two final clarifiers. Bids are due to the Borough Clerk on December 18, 2025 at 11:00 AM prevailing time.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Close: Dec 18, 2025
The Borough of Caldwell (Essex County, NJ) is soliciting sealed bids for the Clarifier Retrofit Project at the Caldwell Wastewater Treatment Plant, including partial demolition and modification to existing sludge collector equipment in two final clarifiers. Bids are due to the Borough Clerk on December 18, 2025 at 11:00 AM prevailing time.
Work includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Work includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
Work includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Work includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;