Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Riverton is soliciting proposals to perform a condition assessment and to replace a clarifier mechanism and UV disinfection equipment at the Riverton Wastewater Treatment Plant (WWTP). A mandatory pre-bid meeting is scheduled for 2025-11-18 at Riverton City Hall and the solicitation closes on 2025-12-09.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
Posted Date
Nov 21, 2025
Due Date
Jan 13, 2026
Release: Nov 21, 2025
Close:
Premium
Access the largest public sector contact database
Work includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
AvailableWork includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
Posted Date
Nov 21, 2025
Due Date
Jan 13, 2026
Release: Nov 21, 2025
Close: Jan 13, 2026
Work includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
AvailableThe City of Albany is seeking proposals for a comprehensive facilities condition assessment of its City-owned capital facilities to review maintenance and repair needs.
Posted Date
Dec 15, 2025
Due Date
Jan 28, 2026
Release: Dec 15, 2025
Close: Jan 28, 2026
The City of Albany is seeking proposals for a comprehensive facilities condition assessment of its City-owned capital facilities to review maintenance and repair needs.
AvailableThe City of Albany is seeking proposals from qualified firms to conduct a comprehensive facilities condition assessment of its City-owned capital facilities.
Posted Date
Dec 15, 2025
Due Date
Jan 28, 2026
Release: Dec 15, 2025
Close: Jan 28, 2026
The City of Albany is seeking proposals from qualified firms to conduct a comprehensive facilities condition assessment of its City-owned capital facilities.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis