Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Oakland County
Excavation and construction of a 12 LF by 12 foot by 12 LF 6 in diversion structure along the interceptor with a 15" pipe connection to a new 5 foot dia. manhole.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Oakland County
DESIGN-BUILD: 13,872 LF of cured in-place pipe (CIPP) lining with either a non-styrenated resin or an encapsulated liner (approx. 30 pipe segments approx. 79 LF long to 1400 LF long, and 54" diameter) Manhole rehabilitation and spray applied lining of (30) 4 ft inner diameter manholes (approximate vertical depths between 20.1 ft to 50.6 ft) Bypass pumping required to isolate each pipe segment to be rehabilitated (3,200 to 8,800 gpm: bypass routes vary between 2,390 ft to 8,140 ft) Traffic control and maintenance for each lining and bypass pumping setup and various additional site preparation, site restoration, SESC controls, and all work within the sewer/manholes to install bypass pumping systems, CIPP liner and spray applied liners.
Posted Date
Sep 30, 2025
Due Date
Jan 6, 2026
Release: Sep 30, 2025
Oakland County
Close: Jan 6, 2026
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
DESIGN-BUILD: 13,872 LF of cured in-place pipe (CIPP) lining with either a non-styrenated resin or an encapsulated liner (approx. 30 pipe segments approx. 79 LF long to 1400 LF long, and 54" diameter) Manhole rehabilitation and spray applied lining of (30) 4 ft inner diameter manholes (approximate vertical depths between 20.1 ft to 50.6 ft) Bypass pumping required to isolate each pipe segment to be rehabilitated (3,200 to 8,800 gpm: bypass routes vary between 2,390 ft to 8,140 ft) Traffic control and maintenance for each lining and bypass pumping setup and various additional site preparation, site restoration, SESC controls, and all work within the sewer/manholes to install bypass pumping systems, CIPP liner and spray applied liners.
AvailableOakland County
Oakland County’s Water Resources Commissioner (WRC) is soliciting bids for open‑cut sanitary sewer rehabilitation in Farmington Hills, Michigan. Bids are due on December 16 2025 at 9:00 AM EST via the county’s BidNet/MITN portal.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Oakland County
Close: Dec 16, 2025
Oakland County’s Water Resources Commissioner (WRC) is soliciting bids for open‑cut sanitary sewer rehabilitation in Farmington Hills, Michigan. Bids are due on December 16 2025 at 9:00 AM EST via the county’s BidNet/MITN portal.
AvailableSan Antonio Water System (SAWS)
WRC Biosolids Upgrades.
Posted Date
Jun 18, 2025
Due Date
Jan 1, 2026
Release: Jun 18, 2025
San Antonio Water System (SAWS)
Close: Jan 1, 2026
WRC Biosolids Upgrades.
AvailableSan Antonio Water System (SAWS)
Rental of Dewatering Centrifuge for SMC WRC.
Posted Date
Nov 19, 2025
Due Date
Dec 9, 2025
Release: Nov 19, 2025
San Antonio Water System (SAWS)
Close: Dec 9, 2025
Rental of Dewatering Centrifuge for SMC WRC.