Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Oakland County
DESIGN-BUILD: 13,872 LF of cured in-place pipe (CIPP) lining with either a non-styrenated resin or an encapsulated liner (approx. 30 pipe segments approx. 79 LF long to 1400 LF long, and 54" diameter) Manhole rehabilitation and spray applied lining of (30) 4 ft inner diameter manholes (approximate vertical depths between 20.1 ft to 50.6 ft) Bypass pumping required to isolate each pipe segment to be rehabilitated (3,200 to 8,800 gpm: bypass routes vary between 2,390 ft to 8,140 ft) Traffic control and maintenance for each lining and bypass pumping setup and various additional site preparation, site restoration, SESC controls, and all work within the sewer/manholes to install bypass pumping systems, CIPP liner and spray applied liners.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Dallas Fort Worth International Airport Police Department
Terminal D grease interceptor rehabilitation.
Posted Date
Oct 5, 2025
Due Date
Dec 1, 2025
Release: Oct 5, 2025
Dallas Fort Worth International Airport Police Department
Close: Dec 1, 2025
Terminal D grease interceptor rehabilitation.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Oakland County
Oakland County’s Water Resources Commissioner (WRC) is soliciting bids for open‑cut sanitary sewer rehabilitation in Farmington Hills, Michigan. Bids are due on December 16 2025 at 9:00 AM EST via the county’s BidNet/MITN portal.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Oakland County
Close: Dec 16, 2025
Oakland County’s Water Resources Commissioner (WRC) is soliciting bids for open‑cut sanitary sewer rehabilitation in Farmington Hills, Michigan. Bids are due on December 16 2025 at 9:00 AM EST via the county’s BidNet/MITN portal.
AvailableGreater New Haven Regional Water Pollution Control Authority
The proposed project includes the cured-in-place pipe (CIPP) lining rehabilitation of approx. 2,744 LF of 42” sewer pipes along the Lower Mill River Interceptor.
Posted Date
Oct 21, 2025
Due Date
Dec 18, 2025
Release: Oct 21, 2025
Greater New Haven Regional Water Pollution Control Authority
Close: Dec 18, 2025
The proposed project includes the cured-in-place pipe (CIPP) lining rehabilitation of approx. 2,744 LF of 42” sewer pipes along the Lower Mill River Interceptor.
AvailableCity of Bridge City
Construction of approx. 854 LF of 8" gravity sanitary sewer line, rehabilitation of approx. 785 LF of existing 6" sanitary sewer line, the construction of 2 new sanitary sewer manholes, abandonment of 1 existing sanitary sewer manhole, removal of 1 existing sanitary sewer manhole, abandonment of approx. 980 LF of existing 8" sanitary sewer line with flowable grout, and approx. 32 service line replacements. Alternate bid items are also included for the rehabilitation of approx. 397 LF of existing 6" sanitary sewer lines and approx. 463 LF of existing 8” sanitary sewer lines.
Posted Date
Nov 16, 2025
Due Date
Dec 4, 2025
Release: Nov 16, 2025
City of Bridge City
Close: Dec 4, 2025
Construction of approx. 854 LF of 8" gravity sanitary sewer line, rehabilitation of approx. 785 LF of existing 6" sanitary sewer line, the construction of 2 new sanitary sewer manholes, abandonment of 1 existing sanitary sewer manhole, removal of 1 existing sanitary sewer manhole, abandonment of approx. 980 LF of existing 8" sanitary sewer line with flowable grout, and approx. 32 service line replacements. Alternate bid items are also included for the rehabilitation of approx. 397 LF of existing 6" sanitary sewer lines and approx. 463 LF of existing 8” sanitary sewer lines.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →