Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project involves repairing and replacing damaged pipes, installing two sanitary manholes, reconnecting and cleaning laterals, and restoring the site. Sewer mains with issues such as damage, displacement, sagging, missing sections, and cracks have been identified at ten locations. The project will use SDR 26 PVC pipes in various sizes, including 6", 8", and 10" diameters. Additionally, two sanitary sewer manholes will be constructed
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The work to be done consists of sanitary sewer point repairs, manhole construction, manhole rehabilitation, cctv inspection, and asphalt pavement restoration; and doing all appurtenant work.
Posted Date
-
Due Date
Feb 11, 2026
Close: Feb 11, 2026
The work to be done consists of sanitary sewer point repairs, manhole construction, manhole rehabilitation, cctv inspection, and asphalt pavement restoration; and doing all appurtenant work.
AvailableThis project involves sanitary and storm sewer point repairs including but not limited to: sanitary and storm sewer excavation point repairs; replacement of wye and lateral pipe; mh installation; location and adjustment of buried sanitary and storm sewer manholes; invert replacement; cctv verification of the repair locations; and the post repair nassco CCTV.
Posted Date
Jan 15, 2026
Due Date
Feb 4, 2026
Release: Jan 15, 2026
Close: Feb 4, 2026
This project involves sanitary and storm sewer point repairs including but not limited to: sanitary and storm sewer excavation point repairs; replacement of wye and lateral pipe; mh installation; location and adjustment of buried sanitary and storm sewer manholes; invert replacement; cctv verification of the repair locations; and the post repair nassco CCTV.
The project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
Posted Date
Jan 13, 2026
Due Date
Feb 5, 2026
Release: Jan 13, 2026
Close: Feb 5, 2026
The project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
Available2026 sanitary sewer rehabilitation. Construct 2026 Sanitary Sewer Rehabilitation project including all labor, materials, and equipment necessary to construct approx. 2,438 LF of Cured in Place Pipe (CIPP) sewer main lining, pre and post internal video inspection, prerehabilitation cleaning, root cutting, protruding service removal, service reinstatement, pressure testing of service connections, injection grouting of service connections, mobilization, traffic control and miscellaneous work, including cleanup.
Posted Date
Jan 20, 2026
Due Date
Feb 12, 2026
Release: Jan 20, 2026
Close: Feb 12, 2026
2026 sanitary sewer rehabilitation. Construct 2026 Sanitary Sewer Rehabilitation project including all labor, materials, and equipment necessary to construct approx. 2,438 LF of Cured in Place Pipe (CIPP) sewer main lining, pre and post internal video inspection, prerehabilitation cleaning, root cutting, protruding service removal, service reinstatement, pressure testing of service connections, injection grouting of service connections, mobilization, traffic control and miscellaneous work, including cleanup.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis