Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Wood poles.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction for a FEMA Utility Distribution Line Hardening Project.
Posted Date
Jan 23, 2026
Due Date
Feb 18, 2026
Release: Jan 23, 2026
Close: Feb 18, 2026
Construction for a FEMA Utility Distribution Line Hardening Project.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Annual supply of wood poles.
Posted Date
Jan 12, 2026
Due Date
Jan 28, 2026
Release: Jan 12, 2026
Close: Jan 28, 2026
Annual supply of wood poles.
AvailableProcurement of an annual supply of wood poles.
Posted Date
Jan 12, 2026
Due Date
Jan 28, 2026
Release: Jan 12, 2026
Close: Jan 28, 2026
Procurement of an annual supply of wood poles.
AvailableWork includes hardening improvements; remove and dispose of existing shingle roof and replace with a standing seam metal roof. Basis of design is 24 ga. , 16" berridge zee lock double lock l - panel with two grooves. Florida product approval fl# 19999. 4; remove and dispose of existing wood roof deck and replace with a steel roof deck, install updated hurricane truss strapping anchors, deck anchorage and truss reinforcement. Provide new equipment curbs as required, typical. See structural and mechanical; install hurricane strap-downs for rooftop equipment and anchoring for roof mounted hvac fans and intakes. Provide new curbs as required, typical. See mechanical.
Posted Date
May 20, 2025
Due Date
Feb 20, 2026
Release: May 20, 2025
Close: Feb 20, 2026
Work includes hardening improvements; remove and dispose of existing shingle roof and replace with a standing seam metal roof. Basis of design is 24 ga. , 16" berridge zee lock double lock l - panel with two grooves. Florida product approval fl# 19999. 4; remove and dispose of existing wood roof deck and replace with a steel roof deck, install updated hurricane truss strapping anchors, deck anchorage and truss reinforcement. Provide new equipment curbs as required, typical. See structural and mechanical; install hurricane strap-downs for rooftop equipment and anchoring for roof mounted hvac fans and intakes. Provide new curbs as required, typical. See mechanical.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →