CityFL
Posted
Oct 16, 2026
Nov 16, 2026
456984-1-54-01 SR 464 and SE 25th Avenue Intersection Improvements RFP
The project scope involves minor widening and reconstruction of the south leg of the intersection. Include roadway modifications, sidewalk improvements, signing and pavement markings, signalization, drainage and lighting. Other construction elements include mobilization, maintenance of traffic, erosion control, removal of existing concrete, clearing and grubbing, milling and resurfacing, detector loops, concrete strain pole, concrete pedestrian pole, pedestrian signal modifications, internally illuminated signs, traffic controller assembly modifications, conduit, signal cable, span wire assembly, pull and splice boxes, electrical power service and service wire, vehicular traffic signals earthwork (regular excavation and embankment), driveway improvements, detectable warnings, and sod.
