Summary
The contractor shall provide all expertise, labor, supervision, services, equipment, tools, supplies, permits (as applicable), coordination with utilities, transportation, and incidentals necessary to complete the work described. The desired outcome is completed installation per the standards attached to this solicitation, and adherence to the contract awarded. The awarded contract shall constitute the entire agreement including all terms and conditions applicable to the contract. Work shall be completed as shown in the drawings, maps, specifications, and exhibits as referenced or included in this contract, and in accordance with applicable federal, state, and local regulations. Work will include demolition of existing 28’ bridge structure and dispose of all materials off FS lands. Construction of the new 44’ bridge. Bridge plans provided show that is structure will use; steel stringers erected from a previous bridge on the forest, concrete abutment and wingwalls with micropiles, and a timber deck and wearing surface. Additional work includes but not limited to armoring shore with riprap, guardrail and approach surface treatment. All details are on attach plans. See attached file.